The Background > The Problem > The Solution > The Result

The Background

Soil Types: miscellaneous fill, fine sand, silty soil, and completely weathered granite, etc.

The foundation is pile cap foundation.

Height Of The Settlement Residential Building: 70.2m

Building Tilt Towards The South: 22.8cm

Total Settlement Amount:106mm

 

 

 

The Problem

The pile ends do not penetrate into the rock, or the depth of penetration is insufficient. The presence of weak miscellaneous fill and the medium to highly compressible foundation soil layers have exacerbated the settlement trend.

 

The Solution

Utilizing the complementary principle of pile-raft to gradually lift the settled ground by injecting special materials until it is restored to a level state. Then, reinforce and strengthen the deep load-bearing sections to eliminate the root cause of the settlement. Our process ensures that our clients are not affected by ongoing construction and are free from the trouble of subsequent issues.

 

The Result

After the completion of the project, the ground was restored to level and the building's verticality met the standards as assessed by the expert group, achieving the acceptance criteria.

Construction Period: 20 days

Total Lift Amount: 106mm

HBIS HanSteel Group Coke Oven Gas Cabinet Foundation Subsidence Reinforcement and Lifting and Tilting Project
Haier Plant Ground Reinforcement Project
Gree Electric Manufacturing Base Sheet Metal Workshop Ground Settlement Treatment Project