Skip to content

Infrastructure · Sectors

Public & Municipal Assets

Targeted remediation for municipal road, underground tunnel and plaza foundation defects.

Engineering overview

Innovative Remediation Solutions to Stabilize Municipal Underground Foundations

Targeted remediation for municipal road, underground tunnel and plaza foundation defects.

Excavation-free soil reinforcement quickly stabilizes underground foundations and guarantees the long-term safe service of municipal infrastructure.

What to assess

Common Public and Municipal Issues We Resolve

01

Subgrade settlement of municipal roadways

02

Foundation deformation of underground utility tunnels

03

Slab collapse and cracking of plaza pavements

04

Soil sliding and instability of retaining walls

05

Foundation subsidence of pump houses

06

Subsurface voids under aged structures

Process Injection

Staged injection · real-time measurement

Our approach

How Hengxiang Hongye Performs Remediation

Through our non-destructive and controllable patented technology, the weak soil layer of the holding layer is consolidated as a whole, and the consolidated and reinforced foundation soil forms a composite foundation, whose bearing capacity value can reach nearly three times of the original bearing capacity, and well support the upper load.

  1. 01
    Drilling

    Bore holes in the affected area with a diameter of 6–10 mm.

  2. 02
    Injection

    Inject a specialized inorganic material.

  3. 03
    Solidification

    The material rapidly solidifies with soil, filling voids and stabilizing the ground.

  4. 04
    Re-balancing

    Lift and reinforce the foundation until re-leveling is achieved.

Start with the condition

Not sure which engineering path fits your asset?

Share photographs, drawings or monitoring information. The team can review the condition and recommend a practical next step.

Request an Assessment ↗