Infrastructure · Solutions
Lifting & Re-Leveling
Achieve millimeter-accurate elevation control to correct tilting, differential settlement, and floor flatness.
Engineering overview
Millimeter-Scale Controllable Lifting & Differential Settlement Correction
Based on Hengxiang Hongye’s non-disruptive and controllable soil solidification technology, through precise regulation and while reinforcing weak soil layers, the expansion and compaction effects of the materials are utilized to achieve millimeter-scale foundation lifting and leveling. Real-time monitoring ensures a smooth and controllable lifting process, accurately restoring the design elevation of buildings and floors.
What to assess
The information that shapes the repair path
Review movement history, ground and drainage conditions, structural loads, access constraints and acceptance criteria. Visible symptoms alone do not determine the suitable intervention.
01
Movement history and visible symptoms
02
Ground and drainage conditions
03
Structural loads and tolerances
04
Access and operating constraints
05
Monitoring and acceptance criteria
06
Long-term asset performance
Staged injection · real-time measurement
Our approach
Hengxiang Hongye Critical Remediation Steps
Through our non-destructive and controllable patented technology, the weak soil layer of the holding layer is consolidated as a whole, and the consolidated and reinforced foundation soil forms a composite foundation, whose bearing capacity value can reach nearly three times of the original bearing capacity, and well support the upper load.
- 01Drilling
Bore holes in the affected area with a diameter of 6–10 mm.
- 02Injection
Inject a specialized inorganic material.
- 03Solidification
The material rapidly solidifies with soil, filling voids and stabilizing the ground.
- 04Re-balancing
Lift and reinforce the foundation until re-leveling is achieved.
Start with the condition
Not sure which engineering path fits your asset?
Share photographs, drawings or monitoring information. The team can review the condition and recommend a practical next step.
Industry context
Related Sectors
Connected conditions
Related Challenges
Engineering response
Related Solutions
Connected evidence
Continue into relevant solutions and work
01Rail · Foundation lifting
Beijing–Shanghai High-Speed Railway Foundation Lifting
02Aviation · Ground improvement
Airport Service Facility Ground Stabilization
03Port · Settlement repair
Port Quay Settlement Stabilization
Technical resources
Supporting information for the next decision
01Engineering insight · 6 min
How Controlled Injection Supports Re-Leveling
02Technical guide · 8 min
Ground Improvement for Operational Infrastructure
03Download · Checklist
