Insufficient Bearing Capacity

Reinforce weak subgrade to satisfy load demands for new and existing structures.

Engineering overview

Causes of Ground Distress

The site contains low-strength strata such as soft soil and muddy soil with low inherent shear strength.

Superimposed loads exceed the bearing limit of the foundation, leading to plastic shear failure of soil.

What to assess

Typical Performance

01

Progressive foundation settlement and deformation

02

Lateral extrusion and heave of foundation soil

03

Slope sliding and instability

04

Extensive pavement settlement

05

Tilting and displacement of structures

06

Widespread cracking of floor slabs

Process Injection

Staged injection · real-time measurement

Our approach

How Hengxiang Hongye Performs Remediation

Through our non-destructive and controllable patented technology, the weak soil layer of the holding layer is consolidated as a whole, and the consolidated and reinforced foundation soil forms a composite foundation, whose bearing capacity value can reach nearly three times of the original bearing capacity, and well support the upper load.

  1. 01
    Drilling

    Bore holes in the affected area with a diameter of 6–10 mm.

  2. 02
    Injection

    Inject a specialized inorganic material.

  3. 03
    Solidification

    The material rapidly solidifies with soil, filling voids and stabilizing the ground.

  4. 04
    Re-balancing

    Lift and reinforce the foundation until re-leveling is achieved.

Connected evidence

Related Cases

Start with the condition

Not sure which engineering path fits your asset?

Share photographs, drawings or monitoring information. The team can review the condition and recommend a practical next step.

Request an Assessment ↗