Skip to content

Case study · Commercial

Chery New Energy Facility Settlement Lifting

Foundation stabilization and controlled lifting inside an active vehicle production facility.

AssetCommercialServiceFoundation correctionPriorityControlled delivery
Project Chery

Illustrative DEMO case narrative. Project descriptions and results shown below are sample content pending confirmation of the project record.

Project Background

Site observations and monitoring identified differential movement affecting serviceability and long-term performance.

Problem

The challenge was to improve support while managing movement, access, safety and operational continuity.

Solution

A staged program combined targeted drilling, inorganic material injection and real-time level monitoring.

Construction Process

The team verified the condition, established monitoring, drilled access points, injected in stages and completed a final survey.

Results

Support was improved, movement remained controlled and the asset returned to its required service condition.

Project Gallery

Related solution

Controlled Foundation Correction

See the approach used to stabilize and re-level foundation movement.

Have a comparable project?

Share photos, drawings or monitoring information.

Start with the condition

Not sure which engineering path fits your asset?

Share photographs, drawings or monitoring information. The team can review the condition and recommend a practical next step.

Request an Assessment ↗